Фрагмент документа "ДИРЕКТИВА СОВЕТА N 1999/31/ЕС ПО ПОЛИГОНАМ ЗАХОРОНЕНИЯ ОТХОДОВ".
Article 12 Control and monitoring procedures in the operational phase Member States shall take measures in order that control and monitoring procedures in the operational phase meet at least the following requirements: (a) the operator of a landfill shall carry out during the operational phase a control and monitoring programme as specified in Annex III; (b) the operator shall notify the competent authority of any significant adverse environmental effects revealed by the control and monitoring procedures and follow the decision of the competent authority on the nature and timing of the corrective measures to be taken. These measures shall be undertaken at the expense of the operator. At a frequency to be determined by the competent authority, and in any event at least once a year, the operator shall report, on the basis of aggregated data, all monitoring results to the competent authorities for the purpose of demonstrating compliance with permit conditions and increasing the knowledge on waste behaviour in the landfills; (c) the quality control of the analytical operations of the control and monitoring procedures and/or of the analyses referred to in Article 11 (1) (b) are carried out by competent laboratories. |
Фрагмент документа "ДИРЕКТИВА СОВЕТА N 1999/31/ЕС ПО ПОЛИГОНАМ ЗАХОРОНЕНИЯ ОТХОДОВ".